TERMITE/PEST CONTROL INSPECTION

a quick overview of what's
required for which loan

back
to previous page

LEGEND
MUST BE DONE
LICENSED CONTRACTOR
RELEASE OF LIABILITY
NO ACTION REQUIRED

 
Inspection Report
Findings
PURCHASE
transaction
REFINANCE
transaction
1.  SUBSTRUCTURE
The accessible areas of the substructure must be inspected.  All finding relating to:
FHA VA CVL FHA VA CVL
a)  excessive moisture
b)  cellulose debris
c)  adequate ventilation
2.  BATHROOM FHA VA CVL FHA VA CVL
a)  the water must be turned on and in operationg order. Second story stall showers do not need to be inspected (in accordance with the Structural Pest Control Exclusion)
b)  caulking
c)  loose tile/linoleum
d)  leaking faucet
e)  loose/leaking toilet
f)  electrical
g)  cracked countertop
h)  plumbing leaks
3.  FOUNDATIONS FHA VA CVL FHA VA CVL
a)  normal setting cracks
b)  excessive foundation cracks
4.  PORCHES - Steps FHA VA CVL FHA VA CVL
earth wood contact
5.  VENTILATION FHA VA CVL FHA VA CVL
adequate ventilation
6.  ABUTMENTS FHA VA CVL FHA VA CVL
earth wood contact
7.  ATTIC SPACES FHA VA CVL FHA VA CVL
must be inspected
8.  GARAGE FHA VA CVL FHA VA CVL
a)  attached/detached must be inspected
b)  inaccessible areas do not have to be inspected unless specifically recommended for a supplemental report for further inspection
9.  DECKS FHA VA CVL FHA VA CVL
attached/detached must be inspected
10.  OTHER FHA VA CVL FHA VA CVL
a)  roof leaks
b)  homeowner/maintenance items
c)  fences earth to wood contact
d)  fungus/dry rot
e)  termite infestation (subterranean, drywood, and dampwood termites)
f)  faulty grade levels
g)  inaccessible areas - inspection required if specifically required by termite inspector

back
to previous page